Calculator tools
Stormwater Detention PRE-POST Calculator
Compare pre-development and post-development stormwater flows, and size the detention storage needed to bring your site back within limits.
What this tool does
Work out your detention requirement
Development increases impervious area, which increases peak stormwater runoff. This calculator compares the pre-development and post-development flows for your site and works out the detention volume required to hold the difference back to an acceptable rate.
Support your consent application
Built for engineers, developers, and specifiers who need a defensible starting point for stormwater design. Use it early to test whether a site works, size the storage before selecting a tank, and reduce back and forth during the consent process.